Reserves / Resources

In 2005, Mine Development Associates completed an NI 43-101 compliant mineral resource estimate for Desert Gold Ventures on the Goldbanks project. This resource estimate, shown below, was published on SEDAR by Desert Gold as part of a technical report on the project. These lower grade, potential open pit resources have been extensively drilled, with over 250,000 metres of drilling in more than 1250 drill holes (15% core).

None of the mineral resources outlined below is currently attributable to Premier Gold.